The window is fixed. The work has to fit inside it.
Introduction
What this covers
A shutdown is the most concentrated maintenance work a plant ever does. Every discipline needs access to the same equipment, in the right order, inside a window that will not move.
IIM assembles and deploys complete multidisciplinary shutdown teams — electrical, mechanical, instrumentation and civil working to one plan, one sequence and one set of handover criteria.
Scope of services
What we take on within this discipline.
01
Shutdown planning support
Scope review, work sequencing, resource planning and identification of the disciplines each job needs.
02
Multidisciplinary execution
Electrical, mechanical, instrumentation and civil teams working to a single coordinated plan.
03
Equipment overhaul
Planned overhaul, inspection and rehabilitation of equipment accessible only during the outage.
04
Testing & recommissioning
Testing, functional checks and commissioning before equipment is handed back.
05
Start-up support
Support through start-up and the stabilisation period that follows.
06
Documentation & handover
Records of work done, test results, findings and recommendations for the next outage.
Equipment & systems covered
Grid stations, transformers and switchgear
Motors, pumps, compressors and fans
Gearboxes and rotating assemblies
Instrumentation, control valves and interlocks
HVAC and utility plant
Structures, foundations and access
Any plant equipment requiring outage access
Typical maintenance activities
Pre-shutdown scope review and planning support
Isolation, permit and safety coordination
Simultaneous multidiscipline execution to sequence
Equipment overhaul and inspection
Testing, calibration and functional verification
Recommissioning and handback
Start-up support and early-life monitoring
Post-shutdown reporting and recommendations
Testing & commissioning
Electrical testing before energisation
Protection and interlock verification
Instrument calibration and loop checking
Mechanical alignment and running checks
Functional testing prior to handback
Commissioning verification and documented sign-off