From the incoming grid station to the last motor terminal.
Introduction
What this covers
Electrical systems are where a plant is most exposed. A single failed protection relay, a degraded HT cable termination or a transformer running past its condition limits can take an entire production line down for days.
IIM deploys electrical engineers and HT technicians who work on live industrial power systems every day — from GIS and AIS grid stations through transformers, switchgear and protection schemes to medium-voltage motors and distribution boards.
Scope of services
What we take on within this discipline.
01
Grid station maintenance
Planned and condition-based maintenance of gas-insulated and air-insulated grid stations, including bay-level work and isolation planning.
02
Transformer services
Inspection, oil sampling, tap-changer attention, bushing and cooling-system checks, and condition assessment of power and distribution transformers.
03
Switchgear & circuit breakers
Servicing, contact and timing work, mechanism attention and functional checks on HT and LT switchgear.
04
Protection & control
Protection relay testing, scheme verification, secondary injection and coordination checks.
05
MV motors & drives
Electrical testing, insulation assessment and maintenance of medium-voltage motors and their supply equipment.
06
Cables & earthing
Cable testing and termination, earth-grid measurement and remedial earthing work.
Equipment & systems covered
GIS (gas-insulated switchgear) bays
AIS grid-station equipment
Power transformers
Distribution transformers
HT switchgear & vacuum circuit breakers
LT panels & distribution boards
Numerical & electromechanical protection relays
Current and voltage transformers
HT and LT power cables
Medium-voltage motors
Capacitor banks & power-factor equipment
Earthing grids and earth electrodes
Typical maintenance activities
Scheduled shutdown maintenance of grid-station bays
Transformer inspection, oil sampling and condition assessment
Circuit-breaker servicing, contact and timing checks
Protection-relay testing and scheme verification
Insulation resistance and polarization index measurement
Winding and contact resistance measurement
Cable testing, jointing and termination
Earth-grid resistance measurement and improvement
Testing & commissioning
Insulation resistance and polarization index (PI)
Winding resistance and contact resistance
Transformer turns ratio and magnetizing current
Circuit-breaker timing and travel analysis
Protection-relay secondary injection testing
CT and VT ratio, polarity and saturation checks
Cable insulation and continuity testing
Earth resistance and earth-grid integrity testing
Pre-commissioning checks and functional verification
Troubleshooting
Repeated or unexplained protection operations and nuisance tripping
Transformer temperature, noise or oil-condition abnormalities
Insulation deterioration and earth faults on HT systems
Motor starting failures, overheating and unbalanced current
Cable faults, joint failures and termination breakdown
Preventive & predictive
Preventive
Planned shutdown maintenance aligned to plant outage windows
Scheduled cleaning, tightening and contact attention
Periodic protection-relay verification
Routine earthing and lightning-protection checks
Predictive
Thermographic survey of connections, panels and terminations
Insulation trend measurement over successive outages
Transformer oil analysis and condition trending
Partial-discharge indications and follow-up assessment
Field work
Project & field-work gallery
Select an image for a full-screen view with equipment and work detail.
Request this expertise
Need a specialist for electrical & power systems?
Tell us the equipment and the problem. We will designate the right specialist or assemble a team around your requirement.